PrinConCreate an account
Now in early access

Compliance‑first construction management for UK principal contractors.

Proof expires in silence. PrinCon hears it sixty days early. Certificates, permits, RAMS and the site register in one record, with every date watched and every chase drafted.

A picture of PrinCon: the certificate register, grouped by what has lapsed and what expires within 60 days, beside today's feed, where PrinCon flags ABC Electrical's insurance and drafts the chase.

app.princon.co.uk/certificates
TodayMon 26 Oct · 07:40

PrinCon

ABC Electrical's insurance expires in 12 days. If it lapses, all four electricians leave Harbour Street in the middle of second fix.

Chase drafted from the policy on file.

LapsedNorthside Scaffold · PQQ

Thursday's scaffold strike at Kings Road is blocked until it's renewed.

ClosedHot works permit HW-014

Quay House, level 2. Signed off by D. Walsh at 16:52.

Built around the cards, tickets and rules your sites already run on

CDM 2015, HSE F10, CSCS, CPCS, NPORS, SMSTS, SSSTS, IPAF, PASMA, CISRS, COSHH, RIDDOR, CITB toolbox talks, JCT variations

How it goes wrong

The proof is everywhere. So nobody sees it go.

One missed date can send four men home and stop a trade for a week. Today the dates live in WhatsApp groups, inboxes, spreadsheets and somebody's memory. PrinCon pulls them into one record per project.

WhatsApp groups, inboxes, spreadsheets, paper and memory all feed one PrinCon record for the project: certificates, permits, RAMS, the site register and drawings.

Know

60days' warningExpiring

Two months out, not two days.

Cards, policies and PQQs turn amber at 60 days, because renewing insurance takes weeks. Every alert says what stops if it lapses.

Act

Drafted
Drafted by PrinCon. Accept or edit before saving.

Every draft waits for a yes.

PrinCon drafts the chase, the permit and the next inspection from what's already on file. Nothing leaves until someone accepts it.

Prove

  1. 09:14Policy PL-20419 superseded by PL-20977
  2. 09:14Uploaded by A. Begum, checked
  3. 07:40Chase accepted by M. Clarke

A record nobody can rewrite without a trace.

Renewals and revisions supersede, they never overwrite. Every change keeps who made it and when.

Why PrinCon

Built the way UK sites already run.

CDM 2015 is in the product, so the right order of things is the easy one. The office gets the detail; the site gets big buttons.

Ask PrinCon

Ask in plain English. Get an answer from the record.

“Who can't start on Monday?” PrinCon checks every certificate and RAMS on the job, names the six, and drafts the chases. Variations are priced from your own past jobs, and every drafted figure waits for you to accept it.

⌘ Kfrom anywhere in PrinCon

A picture of PrinCon answering “who can't start on Monday” with six subcontractors, beside a variation whose cost and extra days PrinCon drafted from two similar past jobs.

who can't start on mondayesc

Answer

Six subcontractors can't start on Monday. Four are waiting on certificates and two on RAMS.

ABC Electrical, insurance 12 daysNorthside Scaffold, PQQ lapsedPlumbline, RAMS 6 days3 more

From 226 certificates and 12 RAMS, checked just now.

Do

Open these six as a register⏎
Chase the four certificate holders4 drafts
Review both RAMS now
↑↓ move⏎ openTab ask a follow-up

HS-014 · VO-008

Price this variation

Rotten joists found under the unit 2 floor. Found on site, not the client's change.

Drafted
Drafted by PrinCon. Accept or edit before saving.
Drafted
Drafted by PrinCon. Accept or edit before saving.
PrinCon: Based on two similar jobs: VO-002 at £3,400 and VO-005 at £3,900, both two days.
2 drafted values to accept
Hot works permitHarbour Street · level 2 plant roomWaiting
  • Construction phase plan issued
  • Pre-construction information answered
  • Site manager namedA. Khan
  • Supervisor namedNot yet
One thing left before this can be issued.

A permit can't be issued before the site is ready for it.

Hot works waits for the construction phase plan, the pre-construction information and a named site manager and supervisor. PrinCon shows exactly what's missing.

31on site now
DWSOJMRoll call ready to print

Fire roll call in sixty seconds.

A QR poster at the gate. Operatives sign in without an account, so the list is live when the alarm goes.

Accepted by D. Walsh, foreman, Kerr Joinery, at 07:42

Foremen sign without logging in.

A permit is accepted by name, on the foreman's own phone. Who signed, and when, stays on the record.

PrinCon

Last week's walkaround raised three findings on level 2. Thursday's inspection is drafted to check them first.

PrinCon drafts. You decide.

AI drafts the paperwork that eats a morning. A person still signs. Every suggestion stays marked as a draft until someone accepts it.

Harbour StreetToday

Made for gloves and bad signal.

Big controls, one job per screen, and nothing on the phone that belongs in the office.

Nobody gets sent home.

PrinCon is in early access for UK principal contractors.

Create an account